Moscow, Polessky pr-d, 16, office 307St. Petersburg, pr-kt Medikov, 3, office 230
Callback
EN
Login

Event results · Tashkent · 24 September 2026

RBI, Corrosion and AI: the seminar is done

Four hours of focused conversation about equipment reliability, the risk-based approach and the practical use of artificial intelligence in Uzbekistan’s chemical industry.

  • MirLux Plaza
  • Executives and technical specialists of the industry
  • RBI Concept

Key outcome

A live professional dialogue rather than a formal conference

The seminar showed strong interest in risk-based reliability management. The discussion quickly went beyond the talks: participants asked practical questions about their own plants, data, implementation timelines and pilot project requirements.

RBI as a management tool

Technical risk linked to the maintenance budget, downtime and investment decisions.

API 580 / API 581

International implementation practice, typical mistakes and what auditors and insurers expect.

AI without the marketing noise

Where AI agents already help engineers, and where data quality is still the limiting factor.

“The level of the questions and the depth of the discussion confirmed that Uzbekistan’s plants already have a strong engineering base, and interest in the risk-based approach is practical.”

Highlights

What we discussed

From calendar-based maintenance to RBI

The cost of unplanned downtime, maintenance budget structure and the investment case.

International practice under API 580 / API 581

Requirements, implementation experience and typical mistakes of first projects in Middle East and Asian petrochemicals.

Equipment damage mechanisms

Ammonia, nitric acid, urea, chloride and sulphate brines, corrosion under insulation.

AI in integrity management

AI agents, automated processing of NDT archives and an honest look at where AI applies and where it does not.

A 12-month pilot project

What is needed from the plant, which data is required and which metrics measure the result.

Panel discussion

Data quality, staffing, regulatory requirements, timelines and the real barriers to implementation.

Materials

Speakers’ presentations

The seminar presentations are available for download as PDF (in Russian).

Next step

From discussion to a pilot project

We are ready to discuss applying RBI, corrosion management and AI tools to a specific unit at your plant: source data, pilot scope, timelines and measurable success criteria.